Zameen 2k pu floor paint
Paint for power blocks, floor tiles & concrete surfaces
Available in:
- 1LTS
- 4LTS
- 20LTS
Select from:
Find in Store
Gloss Resistant
Stain Resistant
Scratch Resistant
Easy to apply
Moisture resistant
Easy Sanding
Fast Setting
Heat Resistant
The surface to be coated should be clean, dry, free from moisture, dampness, microbial growth, ot, grease, dirt and other contaminations.
Application procedure for new surfaces
- Clean thoroughly using a wire brush and then scuff the surface using Sand Paper No. 80. Ensure that no loose particles are sticking to the surface to be coated.
- Apply one coat of Penetration Primer at a DFT of 5 to 10
microns. After 6 hours and within 72 hours, apply the first coat
of Zameen 2K PU Floor Paint shade. Sanding the coat of
Penetration Primer should be avoided. -
After 10 – 12 hours, subject the first coat of Zameen 2K PUFloor Paint shade to mild sanding with Sand paper No. 600and apply the second coat of Zameen 2K PU Floor Paint shade.
-
After completion, allow curing for a minimum period of 72hours @ 30°C before usage.
Application procedure for previously
-
- Clean thoroughly using a wire brush and then scuff the surface
using Sand Paper No. 80 followed by Sand paper No 220.
Ensure that no loose partides are sticking to the surface to be
coated.
- Clean thoroughly using a wire brush and then scuff the surface
After 14 – 16 hours of drying sand using Sand.
- Paper No. 400. Apply 2 coats of the required Zameen 2K PU
Floor Paint shade with an interval of 10 – 12 hours between each
coat. Sand the first coat with Sand Paper No.600. - After completion, allow curing for a minimum period of 72 hours
@ 30°C before usage.
Brush and Roller
Thinner Recommended – Thinner for Finish (TFF)
THINNER INTAKE % | MIXING RATIO (by Volume) |
---|---|
30 – 40% | 7 : 1 |